Bridge / waterfall

Walk a number from start to end so the biggest hole is obvious.

consulting-exhibit

Related: KPI / metric row

When to use

Use when a gap between two totals must be explained. Do not use for a time series (use annotated-chart). Do not use decorative 3D cylinders.

Guidelines

Start, steps, end. Down steps vs up steps use status tokens. Title names the largest hole.

Example

Same-day fill

Dwell, not scan quality, is the 12-point hole in same-day fill.

93% start
−12 dwell
−4 mis-slot
+4 scan
81% now

Midwest DC · trailing 4 weeks · fill % · fictional

Start 93% to 81%; dwell is the hole. Steal labeled steps, not a 3D waterfall.

Rules

  1. Start and end totals are on the board.
  2. Each bar is a named driver with a signed delta.
  3. Title names the largest driver.
  4. Do not truncate the implicit axis to fake drama.

User recipe

Pick family: Consulting exhibit first.

Insert objects:

Assemble:

  1. Start bar, driver bars with signs, end bar
  2. Down steps use status-bad color, up steps use status-good color
  3. Each driver labeled with name and signed delta
  4. Do not truncate axis

Anti-patterns